Environmental

Planning | Permitting | Compliance

 

Due Diligence Environmental Evaluations

Due Diligence Environmental Evaluations

PLANNING & DESIGN

Site Selection
Constraints analysis
Land use and lease mapping
Landman services
Surveying, staking and plats

Facility Design
Well pad and road designs
Impoundment design
Geotechnical/hazard evaluations
P&ID drawing sets

APD Packages

APD Packages

TRANSACTIONAL SERVICES

Environmental & Technical Due Dilligence

ASTM Phase I ESA’s
Phase II Site Assessments
Specialized Oil and Gas Asset Inventory and Evaluation
Compliance liability assessments
Operational liability assessments
Health & Safety liability assessments
Risk ranking and cost analyses
Corrective action planning

Equipment Inventories

Equipment Inventories

ASSET RETIREMENT

Closure and Abandonment
Decommissioning programs
Well plugging & abandonment programs
Pit closure programs
Site impact screening evaluations
Agency negotiations
Remediation, reclamation & restoration services
Litigation support & expert witness services

Permitting & Resource Studies

National Environmental Policy Act (NEPA)
Environmental Impact Statements (EIS)
Environmental Assessments (EA)
Categorical Exclusions (CX)
Baseline conditions assessments

Oil and Gas Specific Permitting
Federal and State APD packages
Surface Use Plan of Operations
Drilling and Completions Plans
Spacing orders and special exemptions
Sundry Notices

Paleontological Resources
Desktop Evaluations
Surveys, testing, and site evaluations
Unanticipated Discoveries
Mitigation planning
Recovery and salvage

Biological Resources
Threatened, Sensitive and Endangered species surveys
Habitat analysis an impact evaluations
Restoration and mitigation planning

Air Quality
Federal and State regulatory applicability analysis
Federal and State Air Registrations/Permits
Equipment testing and reporting
Method 22 Flare Observations
LDAR - FLIR

Well Staking

Well Staking

Water Resources
Sourcing and supply studies
Baseline water quality programs
Watershed studies and modeling
UIC permits (Class I, II, V)
NPDES permits & system design
SWPPP permits & designs
Impoundment design & permitting
Integrated Water Management Plans
U.S. ACOE jurisdictional determinations
Wetland delineations
CWA Section 404 permits

Right-of-way and Easements
Federal and State permit applications
Federal ROW Bond Estimates
Highway/road encroachment permits
Local permits
Survey plats and alignment sheets
Landman Services

 

Resource monitoring and stormwater compliance

Resource monitoring and stormwater compliance

CONSTRUCTION AND OPERATIONAL SUPPORT

Compliance, Monitoring & Coordination
Construction management
Post-drill water quality testing/reporting
Waste stream management
Paleontological resource mitigation
Ecological resource mitigation
SWPPP/reclamation inspection & maintenance
Range management & weed abatement
Inspection Services (CWI/NACE/EI/FERC)
Air quality monitoring, testing & reporting
Emissions/GHG inventories
Chemical storage reporting (SARA Tier II)
Multimedia compliance audits

Health and Safety Standards
On-site health & safety oversight
OSHA compliance audits
Process Safety Management (PSM)
Hazard Operability Process Hazard Analysis (PHA)
Risk Management Plans (RMP)

Spill & Emergency Response Management
Emergency Response Planning (ERP)
Spill Prevention, Control and Countermeasure (SPCC) compliance
Facility Response Plans (FRP)
As-built surveying and mapping
Spill response drills and training
 Spill response management
Spill impact assessments
Site investigation and remediation

SPCC Compliance

SPCC Compliance

Site impact assessment

Site impact assessment

Geotechnical Investigation of slump at oil production tank battery

Geotechnical Investigation of slump at oil production tank battery